Projects
At Voet Energy Solutions, everything is about progress — in technology, sustainability, and collaboration. Every project we undertake addresses today’s energy needs while keeping an eye on tomorrow’s challenges. From temporary power solutions on construction sites to sustainable electricity supply for events and industry, our approach is always thoughtful, reliable, and tailor-made.
Working Together on the Energy of Tomorrow
On behalf of NRG (Dens, Alsema, and Van Vulpen), we are providing the electrical power for a unique, zero-emission drilling installation on the Maasvlakte.
Temporary Power Supply at OLVG Amsterdam During Maintenance
At OLVG Amsterdam, we recently took over the power supply temporarily — without interruptions and without any risk to patient care.
Temporary Power Supply During Maintenance at Center Parcs
Transformer stations at Center Parcs de Eemhof underwent maintenance. This meant shutting off all power. But a holiday park without electricity? That’s not an option.
Quick Response for Heijmans
In November, we received an urgent request from Heijmans: a flower auction had come to a standstill due to a damaged medium-voltage ring.
Zero-Emission Energy Solution On-Site
After last year’s successful pilot project, we have now officially launched projects providing emission-free construction sites with tailored energy solutions.
New Wine Festival 2024
Just like last year, we once again provided a sustainable power supply for the New Wine Festival.
Quick Response and Delivery in Both Zeeland and France
In both Zeeland and France, we installed machines for TOP The Onion Group to help them overcome temporary energy shortages.
Synchronous Grid Transfer at TU Delft: Innovation in Action
An important milestone with our unique Wireless Synchronization Box; we carried out a successful synchronous grid transfer — both takeover and return — for TU Delft.
Phase 3 Energy Supply for Waste Processor in the Botlek
Over the past year, we worked on the temporary energy supply for a waste processing facility. This project was set up to bridge the period until the new energy building is completed.
The Olympic Games 2024 in Paris: Voet Was There!
Our client in Paris could not afford any power outages during the Olympic Games, so they opted for a redundant system.
Installations for Energy Partner Power4You During Festival Season
On July 5, the Dreamfields Festival kicked off — a large-scale event for which Power4You brought us in to jointly provide the energy supply.
Power Supply After Fire in LV Switchroom Parking Garage
In collaboration with Kronenburg Techniek and Joulz, we quickly built a temporary MV switchgear outside the premises.
Power Outage in a 15-Storey Apartment Building in Central Amsterdam
A challenging fault: a power outage in a large part of a 15-storey apartment building in the heart of Amsterdam.
Defective Medium-Voltage Cable at Brick Factory
A defective cable had shut down the power supply at a brick factory. An immediate 3150 kVA was needed.
Sports Park Heerenveen supplied with power during maintenance
The assignment from Joulz last week: ensuring that Sports Park Heerenveen would continue to have power during maintenance.
Phase 2 – Power Supply for Waste Processor After Fire Incident
To bridge the period of constructing a new energy building, they will continue operating on a temporary power supply for the next six months.
Voet Delivers Tailor-Made Power Solution for Waste Processor After Fire Incident
Voet Delivers Tailor-Made Power Solution for Waste Processor After Fire Incident in collaboration with Eqin.
Temporary Power Solution for Transformer Station Upgrade
Liander has started the conversion of a transformer station in Hoorn. The work includes installing a new transformer, switches, and the low-voltage rack.
Wireless Synchronization of 5MW at Syngenta Seeds
For Syngenta Seeds, we supplied uninterrupted power for an entire week, ensuring that daily operations and processes could continue without disruption.
Power Continuity Guaranteed: Temporary Power Solution for Florensis B.V.
A continuous power supply is essential. The importance of this becomes even clearer when planned work on the electricity grid interrupts the power supply.
Temporary Infrastructure for Maintenance Works at St. Antonius Hospital Utrecht
Last month, major maintenance was carried out to safeguard the electrical operations of the main infrastructure at the St. Antonius Hospital.
Sustainable Power Supply at the New Wine Festival
For the fifth year in a row, Voet has provided the temporary power supply for the New Wine festival in Liempde, Brabant.
Rapid Emergency Solution Commissioned by Enexis After Dike Breach in Maastricht
The rising water level of the River Maas caused a dike breach, resulting in a damaged bridge - along with it, the medium-voltage cable running through the bridge.
Power Supply to Vuurtoreneiland, Durgerdam Halted by High Water – Voet Restores Electricity
Power Supply to Vuurtoreneiland, Durgerdam Halted by High Water – Voet Restores Electricity
Emission-Free Drilling, Powered by Batteries
A unique, innovative project: emission-free drilling, fully powered by batteries using only green, renewable energy.
Project Schiphol – From 10kV to 400V at Schiphol
On behalf of BAM Energie & Water, we are supporting a major project at Schiphol. We supplied a medium-voltage temporary installation, a main switchboard, low-voltage distribution boards, and several (kilo)metres of cable.
Project Haga Hospital – Step-Up Transformer and NSA in The Hague
A faulty 10kV cable presents a much bigger risk for some organisations than for others. In a hospital an emergency power installation must always be available.
Project De Kwakel – Sustainable Home, Sustainable Solution
In De Kwakel, Bas and Linda built a fully sustainable barn-style home. The plot used to be farmland — meaning no grid connection was available.
20 MVA Installation for Major Power Outage in Venlo
Thursday to Friday, a major power outage occurred at a 150kV station. As a result, many companies in and around Fresh Park Venlo spent the night in darkness.
2500 kVA Bypass for Two Grid Transformers
Sometimes pictures say more than a thousand words — but here’s a small piece of craftsmanship from our technicians. Last week, we installed a bypass for two grid transformers, each rated at 2500 kVA.
Emergency Power after Flooding in Limburg
On behalf of Enexis Netbeheer, Voet Energy Solutions installed 11 emergency power generators in Valkenburg last week.
Successful Grid Takeover with the New Stage 5 Diesel Engines
Last week, Voet successfully carried out the first synchronous grid takeover using two brand-new John Deere 6090CG550 Stage 5a engines.
Power Supply on Texel
Two of our Super Silent Twinset generators are currently running on Texel to provide power to a campsite on the island.
Emergency Power for Rijnstate Hospital
Voet received a request from Croonwolter&dros to deliver a temporary 4 MVA emergency power installation for Rijnstate Hospital in the Arnhem region.
Operations at Lelystad Airport
Due to work on the power supply at Lelystad Airport, Voet Energy Solutions installed three generators for an extended period.
Emergency Power for Jumbo's Cooling System
Due to the high temperatures in recent weeks, Jumbo's cooling system required additional capacity.
Power for the Festival Season
During this sunny festival season, we installed several generators for Power4you.
Twenty Generators for Walibi
For Walibi Flevoland, we installed around twenty generators for a temporary event.
Malfunction at a Port Terminal
On a Sunday afternoon, we received a report of a transformer failure at a port terminal in Rotterdam.
Emergency Power Supply Urgent Response
Due to a burned-out 2 MVA transformer room, Voet urgently installed a temporary emergency power system.
Maintenance of 10kV Network at Diergaarde Blijdorp
Due to maintenance work on the medium-voltage installation at Diergaarde Blijdorp, the entire medium-voltage system had to be powered down.
Power for Work on the Water
For De Jong Zuurmond, we installed an emergency generator on a ship.
Power Outage in Amsterdam
Due to a major power outage in the center of Amsterdam, thousands of households and businesses were left without electricity.
Faulty Medium-Voltage Installation
On New Year’s Day, we received a report of a power failure in Veenendaal. For Lantor, located right in the city center, we urgently installed a 1000 kVA emergency power unit.
Rotterdam Marathon
A few hours before the start of the Rotterdam Marathon, we installed temporary power units at various locations along the route.
Power Supply for Feyenoord Stadium
We regularly provide backup power with Voet on standby during international matches at the Feyenoord stadium.
Maintenance Air Traffic Control Tower Schiphol
A great challenge to work together with Schiphol's technical maintenance department to provide power to the air traffic control tower.