We supplied power at 10,000 volts via a temporary setup and an open field of the hospital. The grid takeover was carried out synchronously, ensuring the hospital remained fully operational. With our wireless synchronization case, we were able to capture a reference voltage over a long distance and take over in sync. Safe, reliable, and without interruption. Two additional 1500 kVA generators were on standby for maximum security.

This is exactly what Voet stands for: practical solutions for critical power supply.

  • Synchronous grid takeover
  • Wireless synchronization case
  • Hospital
Olvg x voet energy solutions synchrone netovername amsterdam 2
100% groene hosting

© 2025 Voet Verhuur BV

Vragen? Bel met Tom van Scharrenburg +31 (0)345 684 000