Projects
At Voet Energy Solutions, everything is about progress — in technology, sustainability, and collaboration. Every project we undertake addresses today’s energy needs while keeping an eye on tomorrow’s challenges. From temporary power solutions on construction sites to sustainable electricity supply for events and industry, our approach is always thoughtful, reliable, and tailor-made.

Temporary Power Supply at OLVG Amsterdam During Maintenance
At OLVG in Amsterdam, we recently took over the power supply temporarily — without interruptions and without any risk to patient care.

Temporary Power Supply During Maintenance at Center Parcs
Transformer stations at Center Parcs de Eemhof underwent major maintenance. This meant shutting off all power. But a holiday park without electricity? That’s not an option.

Sports Park Heerenveen supplied with power during maintenance
The assignment from Joulz last week: ensuring that Sports Park Heerenveen — including the Abe Lenstra Stadium, swimming pool, Topsport Hall, sports hall, and hospital — would continue to have power during maintenance.

Tijdelijke stroomoplossing voor werkzaamheden aan transformatorhuisje
Grid operator Liander has started the conversion of a transformer station in Hoorn. The work includes installing a new transformer, switches, and the low-voltage rack.

Power Continuity Guaranteed: Voet Energy Solutions Delivers Temporary Power Solution for Florensis B.V.
A continuous power supply is essential. The importance of this becomes even clearer when planned work on the electricity grid interrupts the normal power supply, as was the case for Florensis.

Emergency Power for Rijnstate Hospital
In early 2019, Voet Energy Solutions received a request from Croonwolter&dros to deliver a temporary 4 MVA emergency power installation for Rijnstate Hospital in the Arnhem region.

Operations at Lelystad Airport
Due to work on the power supply at Lelystad Airport, Voet Energy Solutions installed three generators for an extended period.

Maintenance of 10kV Network at Diergaarde Blijdorp
Due to maintenance work on the medium-voltage installation at Diergaarde Blijdorp, the entire medium-voltage system had to be powered down.

Maintenance Air Traffic Control Tower Schiphol
A great challenge to work together with Schiphol's technical maintenance department to provide power to the air traffic control tower.