Sports Park Heerenveen supplied with power during maintenance
The assignment from Joulz last week: ensuring that Sports Park Heerenveen — including the Abe Lenstra Stadium, swimming pool, Topsport Hall, sports hall, and hospital — would continue to have power during maintenance on the transformer station and the replacement of a medium-voltage switch.
For this task, in order to guarantee the continuity of the power supply, we deployed six generators. For the hospital, where an uninterrupted power supply is crucial, we used two generators in load share mode. This means that if one generator fails, the other immediately takes over the load. In this way, we were able to guarantee a reliable power supply.
Together with the client, we ensured that all connections went smoothly. Thanks to this collaboration, the continuity of the power supply for the Abe Lenstra Stadium and the surrounding facilities was safeguarded.
