At Voet Energy Solutions, everything is about progress — in technology, sustainability, and collaboration. Every project we undertake addresses today’s energy needs while keeping an eye on tomorrow’s challenges. From temporary power solutions on construction sites to sustainable electricity supply for events and industry, our approach is always thoughtful, reliable, and tailor-made.

Temporary Power Supply at OLVG Amsterdam During Maintenance
At OLVG in Amsterdam, we recently took over the power supply temporarily — without interruptions and without any risk to patient care.

Temporary Power Supply During Maintenance at Center Parcs
Transformer stations at Center Parcs de Eemhof underwent major maintenance. This meant shutting off all power. But a holiday park without electricity? That’s not an option.

Synchronous Grid Transfer at TU Delft: Innovation in Action
At Voet Energy Solutions, we’ve reached an important milestone with our unique Wireless Synchronization Box; we carried out a successful synchronous grid transfer — both takeover and return — for TU Delft.

Phase 3 Energy Supply for Waste Processor in the Botlek
Over the past year, we have been working on the temporary energy supply for a waste processing facility in the Botlek. This project was set up to bridge the period until the new energy building is completed.

Power Supply After Fire in LV Switchroom Parking Garage
In collaboration with Kronenburg Techniek and Joulz, we quickly built a temporary MV switchgear outside the premises.

Power Outage in a 15-Storey Apartment Building in Central Amsterdam
A challenging fault: a power outage in a large part of a 15-storey apartment building in the heart of Amsterdam. The busbar, which transports energy from the transformer to the top floors, had failed.

Phase 2 – Power Supply for Waste Processor After Fire Incident
The project at a waste processing company in the Botlek has reached a new phase. To bridge the period of constructing a new energy building, they will continue operating on a temporary power supply for the next six months.

Voet Delivers Tailor-Made Power Solution for Waste Processor After Fire Incident
Voet Delivers Tailor-Made Power Solution for Waste Processor After Fire Incident in collaboration with Eqin.

Wireless Synchronization of 5MW at Syngenta Seeds
For Syngenta Seeds in Enkhuizen, we supplied uninterrupted power for an entire week, ensuring that daily operations and processes could continue without disruption.

Temporary Infrastructure for Maintenance Works at St. Antonius Hospital Utrecht
Last month, major maintenance was carried out to safeguard the electrical operations of the main infrastructure at the St. Antonius Hospital, Utrecht location.

Project Schiphol – From 10kV to 400V at Schiphol
On behalf of BAM Energie & Water, we are supporting a major project at Schiphol. We supplied a medium-voltage temporary installation, a main switchboard, low-voltage distribution boards, and several (kilo)metres of cable.

2500 kVA Bypass for Two Grid Transformers
Sometimes pictures say more than a thousand words — but here’s a small piece of craftsmanship from our technicians. Last week, we installed a bypass for two grid transformers, each rated at 2500 kVA.

Emergency Power for Jumbo's Cooling System
Due to the high temperatures in recent weeks, Jumbo's cooling system required additional capacity.

Emergency Power Supply Urgent Response
Due to a burned-out 2 MVA transformer room, Voet urgently installed a temporary emergency power system.