At Voet Energy Solutions, everything is about progress — in technology, sustainability, and collaboration. Every project we undertake addresses today’s energy needs while keeping an eye on tomorrow’s challenges. From temporary power solutions on construction sites to sustainable electricity supply for events and industry, our approach is always thoughtful, reliable, and tailor-made.

Quick Response for Heijmans
In November, we received an urgent request from Heijmans: a flower auction had come to a standstill due to a damaged medium-voltage ring.

Power Supply After Fire in LV Switchroom Parking Garage
In collaboration with Kronenburg Techniek and Joulz, we quickly built a temporary MV switchgear outside the premises.

Power Outage in a 15-Storey Apartment Building in Central Amsterdam
A challenging fault: a power outage in a large part of a 15-storey apartment building in the heart of Amsterdam. The busbar, which transports energy from the transformer to the top floors, had failed.

Defective Medium-Voltage Cable at Brick Factory
A defective medium-voltage cable had shut down the power supply at a brick factory in Walsoorden, Zeeland. An immediate 3150 kVA was needed, which had to be connected to the customer’s medium-voltage network.

Voet Delivers Tailor-Made Power Solution for Waste Processor After Fire Incident
Voet Delivers Tailor-Made Power Solution for Waste Processor After Fire Incident in collaboration with Eqin.

Rapid Emergency Power Solution Commissioned by Enexis After Dike Breach in Maastricht
The rising water level of the River Maas caused, among other things, a dike breach, resulting in a damaged bridge. Along with it, the medium-voltage cable running through the bridge was also affected, which supplies power to the island and the surrounding houseboats.

Power Supply to Vuurtoreneiland, Durgerdam Halted by High Water – Voet Restores Electricity
Power Supply to Vuurtoreneiland, Durgerdam Halted by High Water – Voet Restores Electricity

Project Haga Hospital – Step-Up Transformer and NSA in The Hague
A faulty 10kV cable presents a much bigger risk for some organisations than for others. In a hospital, for example, an emergency power installation must always be available.

20 MVA Installation for Major Power Outage in Venlo
During the night from Thursday to Friday, a major power outage occurred at a 150kV station in Venlo. As a result, many companies in and around Fresh Park Venlo spent the night in darkness.

Emergency Power after Flooding in Limburg
On behalf of Enexis Netbeheer, Voet Energy Solutions installed 11 emergency power generators in Valkenburg last week.

Malfunction at a Port Terminal
On a Sunday afternoon, we received a report of a transformer failure at a port terminal in Rotterdam.

Emergency Power Supply Urgent Response
Due to a burned-out 2 MVA transformer room, Voet urgently installed a temporary emergency power system.

Power for Work on the Water
For De Jong Zuurmond, we installed an emergency generator on a ship.

Power Outage in Amsterdam
One by one, all generators are now returning from Amsterdam. Last Friday and Saturday, we urgently deployed several units to support the low-voltage network.

Faulty Medium-Voltage Installation
On New Year’s Day, we received a report of a power failure in Veenendaal. For Lantor, located right in the city center, we urgently installed a 1000 kVA emergency power unit.

Power Supply for Feyenoord Stadium
We regularly provide backup power with Voet on standby during international matches at the Feyenoord stadium.