Faulty Medium-Voltage Installation
On New Year’s Day, we received a report of a power failure in Veenendaal. For Lantor, located right in the city center, we urgently installed a 1000 kVA emergency power unit.
Within three hours, we had the 1000 kVA system up and running, allowing the company to resume production. Since the company is situated in the middle of the city, we equipped the emergency power unit with a baffle silencer, reducing the noise level to 63 dBA.