Projekte
Bei Voet Energy Solutions dreht sich alles um Fortschritt – in Technik, Nachhaltigkeit und Zusammenarbeit. Jedes Projekt, das wir realisieren, ist eine Antwort auf die Energiefragen von heute, mit Blick auf die Herausforderungen von morgen. Von temporären Energielösungen auf der Baustelle bis hin zu nachhaltigen Stromversorgungen für Veranstaltungen und Industrie: Unser Ansatz ist stets durchdacht, zuverlässig und maßgeschneidert.

Zero-Emission Energy Solution On-Site
After last year’s successful pilot project in Breda, we have now officially launched projects providing emission-free construction sites with tailored energy solutions.

Tijdelijke stroomoplossing voor werkzaamheden aan transformatorhuisje
Grid operator Liander has started the conversion of a transformer station in Hoorn. The work includes installing a new transformer, switches, and the low-voltage rack.

Power Continuity Guaranteed: Voet Energy Solutions Delivers Temporary Power Solution for Florensis B.V.
A continuous power supply is essential. The importance of this becomes even clearer when planned work on the electricity grid interrupts the normal power supply, as was the case for Florensis.

Rapid Emergency Power Solution Commissioned by Enexis After Dike Breach in Maastricht
The rising water level of the River Maas caused, among other things, a dike breach, resulting in a damaged bridge. Along with it, the medium-voltage cable running through the bridge was also affected, which supplies power to the island and the surrounding houseboats.

Power Supply to Vuurtoreneiland, Durgerdam Halted by High Water – Voet Restores Electricity
Power Supply to Vuurtoreneiland, Durgerdam Halted by High Water – Voet Restores Electricity

20 MVA Installation for Major Power Outage in Venlo
During the night from Thursday to Friday, a major power outage occurred at a 150kV station in Venlo. As a result, many companies in and around Fresh Park Venlo spent the night in darkness.

Emergency Power after Flooding in Limburg
On behalf of Enexis Netbeheer, Voet Energy Solutions installed 11 emergency power generators in Valkenburg last week.

Successful Grid Takeover with the New Generation Stage 5 Diesel Engines
Last week, Voet successfully carried out the first synchronous grid takeover using two brand-new John Deere 6090CG550 Stage 5a engines.