In collaboration with United Rentals Europe, we worked over the past year on a temporary power supply for a waste processor in the Botlek. This project was set up to bridge the period until the new power building is ready. As in phase two, we once again constructed an impressive 250-meter scaffold, with a medium-voltage installation at the end.

This medium-voltage installation powers various pumps and equipment. Behind it, we installed three distribution cabinets: one “preferred” cabinet and two “non-preferred” cabinets. The preferred cabinet ensures that, in the event of a grid outage, the generator automatically switches on, keeping the preferred groups energized.

Avr noodstroom brandincident voet energy solutions1

With this approach, we make optimal use of the existing large power connection. By running the cable across the scaffold, we can bring the energy precisely where it’s needed at any given time. This is yet another great collaboration demonstrating how, with smart solutions, we can guarantee reliable power supply — even in challenging environments.

Avr noodstroom brandincident voet energy solutions4
100% groene hosting

© 2025 Voet Verhuur BV

Vragen? Bel met Tom van Scharrenburg +31 (0)345 684 000