Emergency Power Supply - Urgent Response
Due to a burned-out 2 MVA transformer room, Voet urgently installed a temporary emergency power system.
-
1.5 hours
Rapid response
-
Fire-Related
Power Outage
-
In Collaboration
with Joulz
Within an hour and a half of the initial report, Voet arrived on-site with the first unit. Thanks to the swift response and close cooperation between Joulz and Voet, the grower had power restored within five hours.
Because of a water barrier, the full capacity had to be transported over a distance of approximately 100 meters. We accomplished this using a total of 3,500 meters of Powerlock cable.