Grid congestion in winter: how to ensure a sufficient power supply

The cold winter days are approaching and with them, the demand for electricity is also rising. We’re driving electric vehicles more often, heating our homes with heat pumps and switching to electric business processes. This is a positive development, but unfortunately, our power grid can’t handle this growth everywhere. Especially in the winter, when electricity consumption increases, this can lead to grid congestion.

What does this mean for businesses, construction projects and residential neighbourhoods? And more importantly: what solutions are available to ensure a sufficient power supply even during the winter? We’ll explain.

What is grid congestion?

Grid congestion occurs when, at certain times, the demand for or feed-in of electricity exceeds the grid’s capacity. The power grid becomes overloaded.

As we rely more and more on electricity, the pressure on the grid increases. At the same time, expanding grid capacity takes a long time. The consequences are becoming increasingly noticeable: businesses have to wait longer for a new or higher-capacity grid connection and construction and sustainability projects can be delayed due to insufficient grid capacity.

Voet energy solutions netcongestie tennet houten mobiele batterijen

Why does the risk of grid congestion increase in the winter?

In the winter, we use more electricity. The days are shorter, heating systems are running at higher capacity and lighting, charging stations and electric appliances also draw power. Especially during peak times, such as in the morning and early evening, the strain on the power grid can increase significantly. Grid operators are therefore looking for ways to keep the power grid reliable during these peaks. At Voet, for example, we work with grid operators on projects in which we provide temporary additional power supplies. Using mobile batteries and generators, we help absorb peak loads and relieve pressure on the power grid. This demonstrates that temporary power solutions are increasingly playing a key role in addressing bottlenecks in the power grid.

Mobiele batterijen project netcongestie stedin spijkenisse voet energy solutions

What does this mean for businesses, construction projects and residential neighbourhoods?

Grid congestion doesn’t just affect large industrial companies. Limited grid capacity can also pose challenges at construction sites, business locations and in residential neighbourhoods.

Businesses and construction sites

Opening a new business location, using electrical equipment, or expanding a construction project? In that case, a sufficient power supply is essential. If the existing grid connection does not provide enough power, this can certainly cause problems, especially in the winter. Construction heating, lighting, electric machinery and charging stations often all require power at the same time. If insufficient power is available, work can be delayed and costs can rise.

Residential construction and neighbourhoods

Pressure on the power grid is also increasing in residential neighbourhoods. Heat pumps, electric cars and other appliances are driving up energy demand. Especially on cold winter days, when many households are using electricity at the same time, this can lead to grid overload and, in exceptional cases, power outages. In addition, grid congestion can slow down the development of new residential neighbourhoods when there is insufficient capacity available for new connections.

Smart solutions for grid congestion

Expanding the power grid takes time, which is why we at Voet explore what’s possible in the meantime so you don’t always have to wait for a higher-capacity grid connection to provide your project with sufficient power. From mobile batteries and hybrid generators to complete temporary energy hubs: we offer flexible energy solutions tailored to your project’s power requirements. From the very first planning stages, we work with you to determine the most suitable combination of energy sources, tailored to the location and available grid capacity.

Voet energy solutions netcongestie project tennet houten mobiele batterijen

Case study: additional power capacity for the electric grid in Utrecht

In the Utrecht region as well, the electric grid faces additional strain during the winter months. To keep the grid stable and reliable, we were commissioned by TenneT to install a temporary power supply at the Houten-Oost power station.

With this project, we are supplying a total capacity of 27 MW, which is comparable to the electricity consumption of approximately 27,000 households. To make this capacity available, we combined various energy solutions. For example, we deployed 48 batteries; in addition, we supplied 14 generators, 4 temporary power stations, 5 transformer stations and 2 purchasing stations. Together, these installations form a single integrated system that provides additional power capacity when demand for electricity is at its highest.

Even after the system goes live, we will continue to monitor it 24/7. This allows us to oversee the operation of the installations and contribute to a reliable energy supply throughout the winter.

In the video on the right, from RTL Nieuws, you’ll find more information about grid congestion and this project.